The Factory Behind Your Humidifier Programme

In short

We design, tool, mould and assemble humidifiers and aroma diffusers in our own plant. The page below is about the part buyers usually have to ask for: how production actually runs, who is responsible for quality, and what you will see if you come and visit.

Buyers who place a first order with a factory they have never seen carry most of the risk. So we publish the process, name the people accountable for it, and invite you to come and look before you commit — or to have a third party inspect on your behalf.

—
Years manufacturing
As of —
—
Factory floor area
Production and warehouse space
—
Units annual capacity
Confirmed per production plan
—
Production lines
Assembly and packing lines

How the plant runs

From incoming material to a sealed export carton. Each gate can stop a batch.

  1. Incoming materialComponents and resins are checked on receipt against the approved specification. A batch that fails is not released to the line.
  2. Moulding and sub-assemblyTanks and housings are moulded, then sub-assemblies are built and inspected before they meet the main line.
  3. AssemblyUnits are assembled and wired to the configuration agreed in the order — voltage, plug type and control variant.
  4. Functional testingEvery unit is powered up and run: mist output, controls, safety shut-off and leak checks, not a sample pulled from the batch.
  5. Packing and pre-shipment inspectionRetail or export packing, labelling, then inspection before the cartons are sealed and released for shipment.

Who is accountable

Named people, not a department. If something goes wrong on your order, these are the roles that own it.

Quality

Quality manager

Name—
OwnsIncoming checks, testing records, inspection

Engineering

Engineering lead

Name—
OwnsDesign review, tooling, pilot run

Export sales

Export sales lead

Name—
OwnsQuotation, schedule, shipping documents

Photographs and full details are added from the staff record once the people concerned have agreed to be published.

How we got here

StageMilestone and year
FoundedFounding year to be confirmed from the company record
First exportFirst export programme — market and year to be confirmed
CapacityPlant, line or capacity addition — year to be confirmed
TodayCurrent certifications and markets served to be confirmed

Years and details are published from the company record once the underlying documents are verified.

Certification coverage

Which certificates a model holds depends on the model and the market. The detail, with links to the issuing authorities, is on the certifications page.

United States
To be confirmed
Test reports on request
European Union
To be confirmed
Test reports on request
Japan
To be confirmed
Test reports on request
Korea
To be confirmed
Test reports on request

We do not claim that every model holds every certificate. Tell us the model and the market and we will confirm what applies.

Arrange a factory visit

Come and see the line yourself, or send a third-party inspector. Tell us the dates you are considering and which models and processes you want to see, and we will schedule the visit around a live production run.

Arrange a visit
Arrange a factory visit or a third-party inspection Request a Quote

PREVIEW — tinted = data still required from the client, hidden in production. Add ?mode=prod to preview.